Tripp Lite PDU 3-Phase Switched 208V 6.7 kW L21-20P 24 C13; 6 C19 0URM TAA

Mfg.Part: PDU3VS6L2120 | CDW Part: 3621688 | UNSPSC: 39121017
Availability: 4-6 days
Warranties
Was $1,260.00
$811.96 Advertised Price
Advertised Price
Lease Option ($23.95/month) Lease Price Information
Note: Leasing is available to organizations only. Leasing is not available to individuals.
Product Details
  • 6.7kW 3-Phase switched 200/208/240V PDU 0U Vertical with 30 outlets and 6ft cord
  • PDU / Power Distribution Unit / PDU Strip / Switched PDU / rack pdu / pdus / datacenter pdu / network pdu / Vertical PDU
  • Reports voltage and current per-phase via Ethernet interface
  • 30 outlets (24 C13 / 6 C19); L21-20P input 6ft cord
  • Toolless button-mount installation
  • Multi-function digital display with environmental monitoring options
  • TAA-Compliant
View Full Product Details
Better Together
Tripp Lite PDU 3-Phase Switched 208V 6.7 kW L21-20P 24 C13; 6 C19 0URM TAA
Quick View
Total Price:

Product Overview

Main Features
  • 6.7kW 3-Phase switched 200/208/240V PDU 0U Vertical with 30 outlets and 6ft cord
  • PDU / Power Distribution Unit / PDU Strip / Switched PDU / rack pdu / pdus / datacenter pdu / network pdu / Vertical PDU
  • Reports voltage and current per-phase via Ethernet interface
  • 30 outlets (24 C13 / 6 C19); L21-20P input 6ft cord
  • Toolless button-mount installation
  • Multi-function digital display with environmental monitoring options
  • TAA-Compliant
Tripp Lite's PDU3VS6L2120 is a 3 phase Switched PDU / Power Distribution Unit that provides advanced network control and monitoring with the ability to turn on/off, recycle or lock-out power to each individual receptacle, monitor site electrical conditions and remotely monitor output power consumption for each output phase. PowerAlert interface supports remote control and custom notification of user-specified conditions via email, secure web, SNMP, Telnet or SSH interface. Individually switched outlets can be controlled in real-time to remotely reboot unresponsive network hardware, or be custom programmed for user-defined power-up and power-down sequences to ensure proper startup of interdependent IT systems and prevent inrush-related overloads as network equipment is first energized. Unused PDU outlets can be electronically locked off to prevent the connection of unauthorized hardware. Built-in local digital display and remote web/network interface reports detailed voltage, amperage and kilowatt output values per outlet, per load bank and per phase with additional reporting options for power unbalance percentage, IP address and sensor based temperature and humidity data (requires ENVIROSENSE sensor).